Safeguard Construction Gallery E
Sources:
To Defend and Deter
A History of the Huntsville Division
Seize the High Ground
A 20-Year History of the Antiballistic Missile Program
Pan American
(opens in a new window)
Montana
E01 :
West wall of the PAR building. September 73. Source (2).
(439 x 295 = 037k)
Show
|
Omit
descr
(002920)
(887 x 596 = 100k)
Show
|
Omit
descr
E02 :
PAR building interior. September 73. Source (2).
(388 x 295 = 048k)
Show
|
Omit
descr
(002922)
(765 x 582 = 130k)
Show
|
Omit
descr
E03 :
PAR site prior to restoration and cleanup. September 73. Source (2).
PARB in foreground, power plant in center, and heat sink in center left.
(395 x 295 = 58k)
Show
|
Omit
descr
(002919)
(783 x 585 = 99k)
Show
|
Omit
descr
E04 :
Missile site control building (MSCB) with power plant on right. September 73. Source (2).
(414 x 295 = 054k)
Show
|
Omit
descr
(002921)
(836 x 595 = 153k)
Show
|
Omit
descr
E05 :
Missile site control building (MSCB). September 73. Source (2).
(427 x 295 = 045k)
Show
|
Omit
descr
(002923)
(893 x 617 = 136k)
Show
|
Omit
descr
E06 :
Missile site control building (MSCB). September 73. Source (2).
(433 x 295 = 039k)
Show
|
Omit
descr
(002924)
(893 x 609 = 123k)
Show
|
Omit
descr
E07 :
PAR site after restoration work. May 74. Source (2).
Buildings left were donated to local government agencies.
(461 x 295 = 043k)
Show
|
Omit
descr
(002925)
(899 x 575 = 130k)
Show
|
Omit
descr
E08 :
MSR site after restoration work. May 74. Source (2).
Buildings left were donated to local government agencies.
(460 x 295 = 044k)
Show
|
Omit
descr
(002926)
(898 x 576 = 141k)
Show
|
Omit
descr