(Click here if drawing doesn't appear above.)
-
1
-
Combustion air.
-
2
-
Prime mover module No. 6.
-
3
-
Prime mover module No. 4.
-
4
-
Prime mover module No. 2.
-
5
-
Filter room.
-
6
-
Circulating pump room.
-
7
-
Cooling room.
-
8
-
Security operations area corridor.
-
9
-
Waiting area.
-
A
-
Dressing room.
-
B
-
Shower.
-
C
-
Contaminated clothing.
-
D
-
Security operations area.
-
E
-
Monitor room (SOCC (Security Operations Control Center)).
-
F
-
Equipment access corridor.
-
G
-
Alert day room.
-
H
-
Arms room.
-
I
-
Fire hose cabinet.
-
J
-
Shock isolated platform.
-
K
-
Main corridor.
-
L
-
Connection to lower part of the PEUT
(Personnel, Equipment and Utility Tunnel).
(Access to: 1. the MSCB (Missile Site Control Building);
2. the outside world.)
-
M
-
Prime mover module No. 5.
-
N
-
Prime mover module No. 3.
-
O
-
Prime mover module No. 1.
-
P
-
Station service room.
-
Q
-
Medical room.
-
R
-
Exam and treatment room.
-
S
-
Weapons system storage.
-
T
-
Motor generator room.
-
U
-
Freight elevator.
|