(Click here if drawing doesn't appear above.)
1
Finished grade.
2
STRATCOM communication equipment room (STRATCOM = STRATegic COMmand).
3
Cable vault.
4
Acoustic suspended ceiling.
5
SOCC room (SOCC = Security Operations Control Console).
6
SRCE room (SRCE = Sprint Remote Control Equipment).
7
Contaminated clothing chute.
8
Bunk room.
9
Toilet.
9a
Dining & day room.
A
Escape ladder.
B
Emergency escape hatch.
C
Shock isolated platform.
D
Vestibule.
E
Entry tunnel.
F
Cooling condenser units.
G
Corridor.
H
Power generation room.
I
CBR filter room (CBR = Chemical Biological Radiological).
J
Janitor closet.
K
Shower.
L
Mechanical & electrical equipment room.
M
Filter room.
N
Floor level.
O
Intake grille.
P
Exhaust grille.
Q
Air exhaust stack (with ladder inside).
R
Air intake shaft.
S
Ladder with safety device.
T
Sump pump.
U
Equipment entry.
V
Personnel entry.
W
Contaminated clothing room.