1
Personnel emergency exit hatch.
2
Penetration for VLF antenna (VLF = Very Low Frequency).
3
Equipment entry.
4
Personnel entry.
5
Entry tunnel.
6
High point of roof.
7
Air intake shaft.
8
Air exhaust shaft.
9
Concrete pad for electrical transformer.
A
Supports for cooling condenser units.
B
Roof plan.
C
Grade.
D
4 / 1 slope.
E
Elastomeric roofing.
F
Section & entry tunnel.
G
20% slope.
H
Non-compacted earth fill.