(Click here if drawing doesn't appear above.)
1
Docket in wall for door clearance.
2
Antenna coupler attach No. 3.
3
Removable handrail.
4
Launch area antenna.
5
Mechanical, electrical equipment vault (MEEV).
6
Launch preparation equipment vault (LPEV).
7
Door opening.
8
Top of upper platform.
9
Antenna coupler attach No. 2.
A
Umbilical duct.
B
Top of future upper platform.
C
Top of lower platform.
D
Top of future lower platform.
E
Exhaust duct.
F
Launch chamber.
G
Water stop construction joints.
H
Concrete sub slab.
I
Ladder rungs (vertical).