(Click here if drawing doesn't appear above.)
-
1
-
Docket in wall for door clearance.
-
2
-
Antenna coupler attach No. 3.
-
3
-
Removable handrail.
-
4
-
Launch area antenna.
-
5
-
Mechanical, electrical equipment vault (MEEV).
-
6
-
Launch preparation equipment vault (LPEV).
-
7
-
Door opening.
-
8
-
Top of upper platform.
-
9
-
Antenna coupler attach No. 2.
-
A
-
Umbilical duct.
-
B
-
Top of future upper platform.
-
C
-
Top of lower platform.
-
D
-
Top of future lower platform.
-
E
-
Exhaust duct.
-
F
-
Launch chamber.
-
G
-
Water stop construction joints.
-
H
-
Concrete sub slab.
-
I
-
Ladder rungs (vertical).
|