(Click here if drawing doesn't appear above.)
1
Emergency exit tunnel.
2
Earth cover.
3
Finished floor line.
4
Concrete retaining wall.
5
Concrete canopy.
6
Environmental closure (shown retracted).
7
Dock bumper.
8
Vehicle to dock closure.
9
Roadway.
A
Pipe guard.
B
Explosives service magazine.