(Click here if drawing doesn't appear above.)
-
1
-
Duct shafts.
-
2
-
Limits of crane hook travel.
-
3
-
10 ton bridge crane.
-
4
-
Upper part of missile assembly & checkout area.
-
5
-
Upper part of receiving area.
-
6
-
Door hood.
-
7
-
Canopy roof.
-
8
-
Stairway roof.
-
9
-
Earth cover.
-
A
-
Environmental closure: Plan (above), Sections (below).
Left: bag extended; Right: bag retracted
-
B
-
Neoprene coated nylon material air inflated bag with spring loaded roller.
-
C
-
Dock bumper.
-
D
-
Roll-up door.
-
E
-
Pipe guard.
-
F
-
Roof plan.
-
G
-
Emergency exit tunnel.
-
H
-
Retaining walls.
|