(Click here if drawing doesn't appear above.)
-
1
-
Prime mover air intake ducts.
-
2
-
Prime mover exhaust ducts.
-
3
-
Mezzanine, prime mover module No. 6.
-
4
-
Mezzanine, prime mover module No. 4.
-
5
-
Mezzanine, prime mover module No. 2.
-
6
-
Environmental equipment room.
-
7
-
Mechanical equipment room and A/C unit No. 1.
-
8
-
A/C unit No. 1.
-
9
-
Transformer room.
-
9a
-
Shock isolated platforms.
-
9b
-
Battery room.
-
A
-
Emergency exit No. 1.
-
B
-
Officers' quarters
-
C
-
Toilet and shower.
-
D
-
Dormitory.
-
E
-
Alert dormitory.
-
F
-
Food storage.
-
G
-
Dining and day room.
-
H
-
Security personnel quarters.
-
I
-
Shock isolated switch gear platform.
-
J
-
Concrete platform, steps, and ramp.
-
K
-
Corridors.
-
L
-
Connection to upper part of the PEUT (Personnel, Equipment and Utility Tunnel).
(Utility connections to the MSCB (Missile Site Control Building)
and LAUT (Launch Area Utility Tunnel).)
-
M
-
Mezzanine, prime mover module No. 5.
-
N
-
Mezzanine, prime mover module No. 3.
-
O
-
Mezzanine, prime mover module No. 1.
-
P
-
Mechanical equipment room and A/C unit No. 2.
-
Q
-
Office.
-
R
-
Control room (shock isolated floor).
-
S
-
Storage.
-
T
-
Toilet.
-
U
-
Locker room.
-
V
-
Office.
-
W
-
TSE (Tactical Support Equipment) shops and allied trades.
-
X
-
Freight elevator.
|