(Click here if drawing doesn't appear above.)
1
Prime mover air intake ducts.
2
Prime mover exhaust ducts.
3
Mezzanine, prime mover module No. 6.
4
Mezzanine, prime mover module No. 4.
5
Mezzanine, prime mover module No. 2.
6
Environmental equipment room.
7
Mechanical equipment room and A/C unit No. 1.
8
A/C unit No. 1.
9
Transformer room.
9a
Shock isolated platforms.
9b
Battery room.
A
Emergency exit No. 1.
B
Officers' quarters
C
Toilet and shower.
D
Dormitory.
E
Alert dormitory.
F
Food storage.
G
Dining and day room.
H
Security personnel quarters.
I
Shock isolated switch gear platform.
J
Concrete platform, steps, and ramp.
K
Corridors.
L
Connection to upper part of the PEUT (Personnel, Equipment and Utility Tunnel).
(Utility connections to the MSCB (Missile Site Control Building) and LAUT (Launch Area Utility Tunnel).)
M
Mezzanine, prime mover module No. 5.
N
Mezzanine, prime mover module No. 3.
O
Mezzanine, prime mover module No. 1.
P
Mechanical equipment room and A/C unit No. 2.
Q
Office.
R
Control room (shock isolated floor).
S
Storage.
T
Toilet.
U
Locker room.
V
Office.
W
TSE (Tactical Support Equipment) shops and allied trades.
X
Freight elevator.